Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 08: Consents and Permitting Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering, commercial and regulatory, perspective in order to progress the CCS demonstration project at Longannet Power station in Scotland through to construction. The study yielded invaluable knowledge and the resulting material are available for download here. This section of the report provides details of the regulatory work carried out during FEED to achieve the legal requirements of constructing and operating an End-to-End CCS system within European, UK and Scottish legislative frameworks, including implications for consenting of the power plant from which CO2 is to be captured. During the development of the Outline Solution for the UKCCS Demonstration Competition, the Consortium developed a comprehensive Consents Register that tracks month by month progress and captures all relevant Consents, permits and licenses required by the End-to-End CCS chain. A summary of the Consortium progress as of the end of Q1 2011 is provided. Written against a backdrop of significant regulatory change and uncertainty, this report also outlines the process undertaken in identifying consenting risk and provides commentary on the key risks identified, as contained within the project Risk Register. The appropriate summary section from the Feed Close Out Report can be downloaded as a PDF (Consents and permitting.pdf). The main text of the FEED Close Out Report, together with the supporting appendix for this section can be downloaded as PDF files. Note this dataset is a duplicate of the reports held at the National Archive which can be found at the following link - http://webarchive.nationalarchives.gov.uk/20121217150421/http://decc.gov.uk/en/content/cms/emissions/ccs/ukccscomm_prog/feed/scottish_power/consents/consents.aspx
Nenalezeno https://resources.bgs.ac.uk/images/geonetworkThumbs/0f461fd2-dad0-6beb-e054-002128a47908.png
non geographic dataset
: http://data.bgs.ac.uk/id/dataHolding/13606479
English
Geoscientific information
GEMET - INSPIRE themes, version 1.0: BGS Thesaurus of Geosciences:
NGDC Deposited Data
UKCCS
Carbon
Free:
NERC_DDC
publication: 2011-04
2010-03 - 2011-04
Department of Energy & Climate Change (DECC)
Department of Energy & Climate Change (DECC)
, United Kingdom
email: not available
Role: owner
ScottishPower
ScottishPower
, United Kingdom
email: not available
Role: originator
Scottish CCS Consortium
Scottish CCS Consortium
, United Kingdom
email: not available
Role: originator
ScottishPower CCS Consortium
ScottishPower CCS Consortium
, United Kingdom
email: not available
Role: principal investigator
British Geological Survey
Enquiries
The Lyell Centre, Research Avenue South, EDINBURGH, EH14 4AP, United Kingdom
tel: 0115 936 3142
email: enquiries@bgs.ac.uk
Role: distributor
British Geological Survey
Enquiries
The Lyell Centre, Research Avenue South, EDINBURGH, EH14 4AP, United Kingdom
tel: 0115 936 3142
email: enquiries@bgs.ac.uk
Role: point of contact

Data Quality

ScottishPower began developing the Longannet Carbon Capture and Storage project in 2007 in response to the UK Government’s competition to demonstrate full-scale CCS on power generation in the UK. In the summer of 2009, the ScottishPower CCS Consortium, comprising ScottishPower, National Grid and Shell was formed to further develop this project, which could be one of the world’s first full-scale CCS demonstration plants. In March 2010, the Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what exactly would be required from an engineering, commercial and regulatory, perspective in order to progress the CCS project through to construction.
INSPIRE Implementing rules laying down technical arrangements for the interoperability and harmonisation of Geology
Commission Regulation (EU) No 1089/2010 of 23 November 2010 implementing Directive 2007/2/EC of the European Parliament and of the Council as regards interoperability of spatial data sets and services

Constraints

The copyright of materials derived from the British Geological Survey's work is vested in the Natural Environment Research Council [NERC]. No part of this work may be reproduced or transmitted in any form or by any means, or stored in a retrieval system of any nature, without the prior permission of the copyright holder, via the BGS Intellectual Property Rights Manager. Use by customers of information provided by the BGS, is at the customer's own risk. In view of the disparate sources of information at BGS's disposal, including such material donated to BGS, that BGS accepts in good faith as being accurate, the Natural Environment Research Council (NERC) gives no warranty, expressed or implied, as to the quality or accuracy of the information supplied, or to the information's suitability for any use. NERC/BGS accepts no liability whatever in respect of loss, damage, injury or other occurence however caused.
Either: (i) the dataset is made freely available, e.g. via the Internet, for a restricted category of use (e.g. educational use only); or (ii) the dataset has not been formally approved by BGS for access and use by external clients under licence, but its use may be permitted under alternative formal arrangements; or (iii) the dataset contains 3rd party data or information obtained by BGS under terms and conditions that must be consulted in order to determine the permitted usage of the dataset. Refer to the BGS staff member responsible for the creation of the dataset if further advice is required. He / she should be familiar with the composition of the dataset, particularly with regard to 3rd party IPR contained in it, and any resultant use restrictions. This staff member should revert to the IPR Section (ipr@bgs.ac.uk) for advice, should the position not be clear.

Metadata about metadata

0f461fd2-dad0-6beb-e054-002128a47908
British Geological Survey
The Lyell Centre, Research Avenue South, EDINBURGH, EH14 4AP, United Kingdom
tel: +44 131 667 1000
email: enquiries@bgs.ac.uk
Role: point of contact
2024-04-24

Coupled Resource